Project Configurator for Jira
Project Configurator for Jira
- PCJ:How-to articles
- PCJ:How to identify where objects are used in a workflow
- How to retrieve the history logs of Import and Export process for the Project Configurator for Jira app
- Permission issues while migrating a private dashboard
- PCJ:How to import data from an older version of Jira
- PCJ:How to manually migrate attachments
- PCJ:Replacing IDs in Filter Queries in the Same Instance
- PCJ:How to identify where objects are used inside my Jira instance
- PCJ:How to Split an Import into Separate Stages
- PCJ:How to retrieve debug logs for the Project Configurator app
- PCJ:How to automatically migrate ScriptRunner Behaviours between your staging and production instances.
- PCJ:How to see what configuration objects are supported by Project Configurator
- How to remove users while creating an export from the source instance using Project Configurator for Jira
- How to deal with leftover app custom fields that cause export errors
- PCJ-Troubleshooting articles
- PCJ-Project "XXX" was not found
- PCJ-User "XXX" was not found
- PCJ-Group "XXX" was not found
- PCJ-Error stating that the Priority with name null is not available for scheme Default priority scheme
- PCJ-Custom field context that applies only to some issue types
- PCJ-A null pointer error referring to priority schemes is displayed when exporting projects
- PCJ-After an Import Remote Links or Confluence Links are Missing
- PCJ-After an Import the moved issue keys are missing
- PCJ-Error stating that The selected filter is not available to you, perhaps it has been deleted or had its permissions changed
- PCJ-Exporting Service Management project fails due to Request Type referencing missing custom field
- PCJ-Troubleshooting a NullPointerException caused due to a null text value for a custom field value
- PCJ-Sprints across several projects are duplicated
- PCJ-DataAccessException occurred while creating Entity type 'EntityProperty'
- PCJ-Time in Status Field Does Not Exist
- PCJ-The custom field 'XXXX ' requires option 'YYYY' for the import but it does not exist in the current JIRA instance
- PCJ-java.lang.NumberFormatException: For input string: "[99999]"
- PCJ-Missing a FieldLayoutItem for FieldLayout XXXX and field YYYYY
- PCJ-Unable to import values for the "Time in Status" custom field
- PCJ-Validation error without any further information
- PCJ-No timezone information in the exported data
- PCJ-java.lang.NumberFormatException: null within SprintImportHandler
- PCJ-Error stating that The largest text field with length of XXXXX exceeds the allowed limit of XXXXX
- PCJ-Service Management queues using components are not created on import
- PCJ-Error about orphaned custom field values
- PCJ-Error stating Caused by: com.atlassian.jira.exception.CreateException: Error occurred while creating issue through workflow
- PCJ-Error stating a field used inside a screen must exist
- PCJ-Import File not being displayed
- PCJ-Error saying the status used in the backup file is not used by the workflow
- PCJ-Error of Impossible to access components of the import zip file after decompressing it. Please verify it has not been altered since it was exported from the source JIRA.
- PCJ-Unmet pre-condition: Project xxxxx must exist when importing in project configuration
- PCJ-Unmet pre-condition: User xxxxx must exist when importing in project configuration
- Troubleshooting the "No projects left to import.." error during import using Project Configurator for Jira
- Troubleshooting error due to an event with a null template when exporting a project using Project Configurator for Jira
- PCJ-Unmet pre-condition: Group @xxxxx must exist when importing in project configuration
- PCJ - Troubleshooting the Error : "There is already a configuration import/conflict detection task running"
- PCJ - Troubleshooting the Error : "java.lang.IllegalArgumentException: File name parameter is missing"
- Lexorank error when importing Jira project using the Project Configurator for Jira app (PCJ)
- PCJ - StackOverflowError when there is a circular dependency in nested groups in Crowd
- PCJ - Invalid content was found starting with element 'daysInColumnShown'. One of '{column}' is expected.]
- PCJ-XPathFactoryImpl not found when running in Groovy scripts
- Project import is failing with an error “Data import failed with exception: empty String“
- Project Configurator for Jira - Troubleshooting the validation error received during project import.
- Project Configurator for Jira - When exporting a project with a problematic custom field
- Troubleshooting missing event types in workflow errors in Project Configurator for Jira
- PCJ: Same Key Project present in Destination instance
- Project Import Failure Due to Custom Field Error in Project Configurator for Jira
- FAQ:Frequent Exporting and Importing Errors
- Delegated Project Notifications for JIRA
, multiple selections available,
Related content
Project Configurator for Jira Server/Data Center
Project Configurator for Jira Server/Data Center
More like this
Integration with ScriptRunner for Jira
Integration with ScriptRunner for Jira
Read with this
Export configuration data
Export configuration data
Read with this
General settings
General settings
Read with this
Overview
More like this
1. Introduction
1. Introduction
More like this